000 03161nam a2200241 a 4500
001 vtls000029640
003 KUKTEM
005 20251114204418.0
008 080624t2007 my f m 001 0 eng|d
020 _aTHE0002875(Local)
039 9 _a201905131542
_bzul
_c201107132240
_dVLOAD
_c200908141459
_dVLOAD
_c200908141430
_dVLOAD
_y200806240955
_zkam
040 _aUMP
090 _aTA710.5 .A43 2007 rs Thesis
100 0 _aMohd Amar Ridha Abd Ghoni
245 1 0 _aAnalysis of slope stability of Ordinary Method of Slices and Bishop's Simplified Method /
_cMohd Amar Ridha Bin Abd Ghoni
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _a75 p. :
_bill. (some col.) ;
_c30 cm.
502 _aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3 _aSlope failure and landslide have become significant problems nowadays. The slope stability issue is a problem that must be given serious attention. The detailed study towards slope instability causes must be carried out to identify the efficient methods of stabilizing techniques. Besides that, calculation and selection of slope factor of safety (POS) must be analyzed and carried out closely to make sure that FOS is suitable for the slope. This study includes slopes types, slope instability factors, methods of slope stability, and the analysis of FOS in determining the slope stability. Data were taken from a real project site at Section CR-94/000 FT04, Lebuhraya Timur Barat, Kelantan. The methods that use for analysis in this study are Ordinary Method of Slices and Bishop's Simplified Method. SLOPEIW 2004 Student Edition (GeoStudio 2004) is set to be use as software application to analyze the slope stability. This study also attempts to give control methods of slope stabilization using drainage, slope alteration and retaining structure. The FOS value for initial condition of slope is 0.866 by Ordinary Method of Slices and 1.028 by Bishop's Simplified Method. With cost RM 250,000 for each project, remediation by decreasing the slope angle produces the FOS values 1.243 and 1.426 for each Ordinary Method of Slices and Bishop's Simplified Method. The remediation using benching method that cost about RM 400,000 per project creates FOS values 1.520 for Ordinary Method of Slices and 1.557 for Bishop's Simplified Method. The remediation using horizontal drainage and soil nail need cost arowld RM 700,000 however, call11ot be analyzed according to the limitation of SLOPEIW 2004 Student Edition. At the end of this study, the remediation using benching method is selected as the remedial technique for this slope which has high FOS value and acceptable cost which is RM 400,000. Besides, the routine inspection and maintenance should be carried out to ensure the slope is in safe condition. Nevertheless, the issue of slope stability is still much this day and need a further study and research so that this problem can be reduce in future. -Author
650 0 _aSlopes (Soil mechanics)
_xStability
650 0 _aSlopes (Soil mechanics)
_xComputer programs
999 _aVIRTUA40
_c1596
_d1602
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*6501*9992