000 01008nam a2200241 a 4500
001 vtls000054035
003 KUKTEM
005 20251114204330.0
008 110614t2011 enka f b 001 0 eng d
020 _a9781444334937 (pbk. : alk. paper)
020 _a144433493X (pbk. : alk. paper)
039 9 _a201904301117
_bAUTHORITY
_c201703091102
_dnazri
_c201111031233
_dfauzi
_c201107140055
_dVLOAD
_y201106141610
_zirma
040 _aUMP
090 _aTH438.4 .G85 2011 f
245 0 0 _aGuide to good practice in the management of time in complex projects /
_cthe Chartered Institute of Building
260 _aChichester, West Sussex, UK ;
_aAmes, Iowa :
_bWiley,
_c2011
300 _axxv, 143 p. :
_bcol. ill. ;
_c30 cm.
504 _aIncludes bibliographical references and index
650 0 _aBuilding
_xSuperintendence
650 0 _aProduction scheduling
710 2 _aChartered Institute of Building (Great Britain)
999 _aVIRTUA40
_c171
_d177
999 _aVTLSSORT0080*0200*0201*0400*0900*2450*2600*3000*5040*6500*6501*7100*9992