245 1 0 _aProductivity improvement in industry by using witnes software /
_cWan Faizul Wan Mustafa
246 3 _aProductivity improvement in industry by using witnes software
_h[electronic resource]
260 _aKuantan, Pahang :
_bUMP,
_c2008
300 _a66 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 computer disc
502 _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008
520 3 _aProductivity is a method to measure the performance or efficiency in the industry, organization or factory. The project is focused on trim line production of Mercedes Benz car. The study are about to improve production productivity, reduce waiting time in production line, increase the production in one day in order to achieve the target, used up all the space in the factory usefully and increase the busy at production line to the maximum by using Witness software. Person in charge and workers interview is done to collect some information about the assembly line in determining problems occur. Other than that, direct observation method, archival data and self collecting data are used. Live experiments are conducted on production lines. Four problems are identified such as reworked, not enough manpower, delayed process, high waiting time, and low production which are not in the target for one day production. Interventions are made to rectify the problems such as to reduce waiting time in problem’s section by adding buffer which for temporarily storage for finished part in order to minimize waiting time for finished section sent the finish part without have to wait. As a result, the production productivity for the trim line production is increased.
650 0 _aProduction management
650 0 _aIndustrial productivity
650 0 _aProduction control