000 00952nam a2200253 a 4500
001 vtls000002363
003 KUKTEM
005 20251117142007.0
008 060614t2005 njua f 001 0 eng d
020 _a0130973149
039 9 _a201904301147
_bAUTHORITY
_c201904301029
_dAUTHORITY
_c201107131641
_dVLOAD
_c201103011649
_dida
_y200606141108
_zVLOAD
040 _aUMP
090 _aTH438.4 .M82 2005
100 1 _aMubarak, Saleh
245 1 0 _aConstruction project scheduling and control /
_cSaleh Mubarak
260 _aUpper Saddle River, NJ :
_bPearson,
_c2005
300 _axxi, 394 p. :
_bill. ;
_c25 cm.
500 _aIncludes glossary and index
504 _aIncludes bibliographical references (p. 378-386)
650 0 _aBuilding industry
_xManagement
650 0 _aBuilding
_xSuperintendence
650 0 _aProduction scheduling
999 _aVIRTUA40
_c20253
_d20259
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5040*6500*6501*6502*9991