000 02160nam a2200241 a 4500
001 vtls000029331
003 KUKTEM
005 20251114204438.0
008 080609s2007 my f 001 0 eng|d
020 _aTHE0003484(Local)
039 9 _a201905151200
_birma
_c201107140035
_dVLOAD
_c201103021458
_dida
_c200908141328
_dVLOAD
_y200806091627
_zfara
040 _aUMP
090 _aTH438.4 .L54 2007 rs Thesis
100 1 _aLiew, Ahu Wen
245 1 0 _aPlanning and scheduling for sport complex :
_ba case study of Indoor Stadium Terengganu /
_cLiew Ahu Wen
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _axiv, 114 p. ;
_c30 cm.
502 _aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3 _aPlanning and scheduling is one of the processes in construction project. A proper planning and scheduling may produce a smooth work flow and ease the monitoring and controlling of project. In Malaysia construction industry, there are no standard guidelines to produce an accurate schedule. In addition, the techniques of the project management software are still new for the users due to lack of expose of the software especially P3. This research is focused on breaking down the work activities into detail level, the theory of time duration and determines the time duration in building construction. Work quantity and productivity of labors/ logistic are identified. Time duration for main structures of sport complex is estimated. From the analysis, the time duration for piling works is 63 days, lower ground floor is 201 days, ground floor is 485 days, first floor is 144 days, second floor is 239 days, third floor is 245 days, fourth floor is 241 days and roof system is 237 days. The overall time duration for this project is 739 days. This research may produce a guideline to the scheduler in estimating time duration for building construction and provide a platform for further study in advances the theory of scheduling.-Author
650 0 _aBuilding
_xSuperintendence
650 0 _aProduction scheduling
999 _aVIRTUA40
_c2174
_d2180
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*6501*9992