000 00958nam a2200253 a 4500
001 vtls000007296
003 KUKTEM
005 20251117142205.0
008 060606t2003 gaua f 001 0 eng d
020 _a0881732710
039 9 _a201207061214
_bida
_c201107131724
_dVLOAD
_c201103030834
_dida
_c200908141054
_dVLOAD
_y200606141133
_zVLOAD
040 _aUMP
090 _aTJ163.5.B84 W35 2003
100 1 _aWaltz, James P.
245 1 0 _aManagement, measurement and verification of performance contracting /
_cJames P. Waltz
260 _aGeorgia :
_bThe Fairmont Press, Inc,
_c2003
300 _axv, 347 p. :
_bill. ;
_c24 cm.
504 _aIncludes bibliographical references (p. 337-341) and index
650 0 _aBuildings
_xEnergy conservation
650 0 _aBuildings
_xMaintenance
650 0 _aPerformance contracts
650 0 _aBuilding management
999 _aVIRTUA40
_c24230
_d24236
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5040*6500*6501*6502*6503*9992