000 02536nam a2200253 a 4500
001 vtls000045909
003 KUKTEM
005 20251114204450.0
008 100525t2009 my dao f m 000 0 eng d
020 _aTHE0006278(Local)
039 9 _a201905171133
_baida
_c201107131904
_dVLOAD
_y201005251523
_zFida
040 _aUMP
090 _aTJ407 .A97 2009 rs Bc.
100 0 _aMohd Azri Aris
245 1 0 _aWhole energy balance for IKW steam power plant /
_cMohd Azri Bin Aris
246 3 _aWhole energy balance for IKW steam power plant
_h[electronic resource]
260 _aKuantan, Pahang :
_bUMP ,
_c2009
300 _axv, 59 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 computer disc
502 _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2009
504 _aBibliography: p. 57
520 3 _aThis thesis is deals with whole energy balance for 1kW steam power plant. The steam power plant that been used for this thesis is Cussons P7690/SP. The objective of this thesis is to study detail and analyze the whole energy balance of the steam power plant, the efficiencies, and losses. The thesis describes the procedure of three sets of experiment to achieve the objective. Those three sets of experiments are energy balance of a plant as a whole analysis, determination of principal plant component efficiencies, and energy balance for cooling tower analysis. Detail study of each plant component had been done before those experiments run. Those study such as forms of energy, function of main component in steam power plant, energy balance, component efficiencies and psychrometry theory. Parameters involved in experiment was then be analyzed to be use for each sets of experiments. These parameters as guide for the thesis will be done according to the objective and time planning. Calculation and analysis had been done after all parameters needed for the thesis has been observed. The obtained results indicated that the energy generated by the plant and energy produced from the plant are balanced. Also, the efficiency value of main plant component such as boiler, superheater, and condenser are obtained. From the calculated result, state that energies in cooling tower of this plant are not balanced. By the end of the thesis, the successful of the project had been stated and some of recommendations had been given for future research and development.
650 0 _aSteam power plants
999 _aVIRTUA40
_c2512
_d2518
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5040*5200*6500*9992