000 02492nam a2200265 a 4500
001 vtls000058141
003 KUKTEM
005 20251114204452.0
008 120105t2010 my a f m 000 0 eng d
020 _aTHE0003790(Local)
039 9 _a201905151459
_bshah
_y201201051158
_zida
040 _aUMP
090 _aTP156.A33 A75 2010 rs Bc.
100 0 _aMohd Ariff Kamali
245 1 0 _aRemoval of heavy metal from industrial wastewater using ultrasonic assisted by tea waste as adsorbent /
_cMohd Ariff Kamali
260 _aKuantan, Pahang :
_bUMP,
_c2010
300 _axiv, 47 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Chemical Engineering) -- Universiti Malaysia Pahang - 2010
504 _aBibliography : p. [36]-38
520 3 _aWastewater from industry can lead to water pollution if untreated, especially due to its high concentration of heavy metals. Heavy metals are considered extremely harmful because they can cause illnesses, disorder and diseases to human. Therefore, industrial wastewater containing heavy metal should be treated before discharge to the water stream but its treatment is very costly. There are several techniques to remove heavy metals from wastewater such as biosorption, filtration and adsorption of heavy metal but there is some limitation such as long treatment time. This research is about the efficiency of combination method between ultrasonic and adsorption process to remove zinc, Zn and nickel, Ni from fertilizer factory wastewater. The parameters analyzed in this research are amounts of adsorbent in solutions from 0.5 g to 2.9 g of tea waste, different ultrasonic temperature from 40° C to 80° C and different sonication time from 5 minute to 29 minutes. After several experiment and analysis of results, it is found that the optimum condition to remove Zn and Ni from 100 ml wastewater is at 24 minute sonication time and 75°C ultrasonic temperature for 2.5 g amount of adsorbent which can remove about 79% of zinc and 71% of nickel. According to the result, the method of ultrasonic assisted by adsorption process to remove heavy metal from industrial wastewater can be use effectively because it can reduce energy, time and cost of treatment.
650 0 _aUltrasonic waves
650 0 _aSewage
_xPurification
_xHeavy metals removal
650 0 _aSorbents
_xAbsorption and adsorption
999 _aVIRTUA40
_c2561
_d2567
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*6502*9992