| 100 | 0 | _aMohd Zaini Jamak | |
| 245 | 1 | 0 |
_aDevelopment of production sequencing software for industry / _cMohd Zaini Bin Jamak |
| 246 | 3 | _aDevelopment of production sequencing software for industry /h[electronic resource] | |
| 260 |
_aKuantan, Pahang : _bUMP, _c2008 |
||
| 300 |
_a92 p. : _bill. (some col.) ; _c30 cm. + _e1 computer disc |
||
| 502 | _aProject paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2008 | ||
| 520 | 3 | _aThe aim of this project is to develop a production sequencing software for specific company. Research has started with the trailing of a specific area in their production process that undergo problem in term of sequencing. Thus, in the first phase, all the problem sources and correlation in that area have been identified to overcome it using the sequencing element. Next, the problems that have been identified were solved through the development of software to provide an organized computerized sequencing system. The software has been developed by Visual Basic .NET that filled all the problem solving criteria and was simulated so that it is suitable with the environment of research area. At the final of the project, the production sequencing software have been developed successfully and accepted by company to improve the sequencing in research area. | |
| 650 | 0 |
_aProduction engineering _xData processing |
|
| 650 | 0 | _aSoftware sequencers | |
| 999 |
_aVIRTUA40 _c2573 _d2579 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*9992 | ||