| 000 | 01822nam a2200265 a 4500 | ||
|---|---|---|---|
| 001 | vtls000040411 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204452.0 | ||
| 008 | 090716t2009 my a f m 000 0 eng|d | ||
| 020 | _aTHE0006923(Local) | ||
| 039 | 9 |
_a201906131057 _baida _c201107132154 _dVLOAD _c200911091850 _dkam _c200908141648 _dVLOAD _y200907161004 _zida84 |
|
| 040 | _aUMP | ||
| 090 | _aTK7871.99.T5 F33 2009 rs Bc. | ||
| 100 | 0 | _aMohamad Fadzli Abdul Rahman | |
| 245 | 1 | 0 |
_a6 pulse GTO thyristor converter simulation / _cMohamad Fadzli Abdul Rahman |
| 246 | 3 |
_a6 pulse GTO thyristor converter simulation _h[electronic resource] |
|
| 260 |
_aKuantan, Pahang : _bUMP, _c2009 |
||
| 300 |
_a45 p. : _bill. (some col.) ; _c30 cm. + _e1 computer disc |
||
| 502 | _aProject paper (Bachelor of Electrical Engineering (Power systems)) -- Universiti Malaysia Pahang - 2009 | ||
| 520 | 3 | _aNowadays, the development of a large capacity Gate Turn Off (GTO) thyristor has made it possible to manufacture self-commutated converter employing GTO thyristor for power applications. This project focused on the design of GTO thyristor model by using PSPICE, the analysis of switching waveform of GTO thyristor and the implementation of GTO thyristor as a control element in 6 pulse converter circuit. This project also includes the explanations of the settings of operation condition and gate circuit parameters including firing angle and time delay of turn-on and turn-off pulses. Simulation results of dc output voltage are compared with mathematical calculation results, and it is shown that almost similar characteristics curves are obtained. | |
| 650 | 0 | _aThyristor converters | |
| 650 | 0 | _aThyristor control | |
| 650 | 0 | _aThyristors | |
| 999 |
_aVIRTUA40 _c2579 _d2585 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*6502*9992 | ||