000 02405nam a2200265 a 4500
001 vtls000041256
003 KUKTEM
005 20251114204455.0
008 090811t2008 my a f m 000 0 eng|d
020 _aTHE0007491(Local)
039 9 _a201905161433
_bfawwaz
_c201107132231
_dVLOAD
_c200908141655
_dVLOAD
_c200908141638
_dVLOAD
_y200908111200
_zida84
040 _aUMP
090 _aTS155 .S56 2008 rs Bc.
100 0 _aShuhairy Said
245 1 0 _aLean manufacturing implementation for low volume car production /
_cShuhairy Said
246 3 _aLean manufacturing implementation for low volume car production
_h[electronic resource]
260 _aKuantan, Pahang :
_bUMP,
_c2008
300 _a45 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 computer disc
502 _aProject paper (Bachelor of Mechanical Engineering with Automotive) -- Universiti Malaysia Pahang - 2008
520 3 _aThe purpose of this project is to analyze the implementing of the lean methodology to low volume car production. There are many problem occurs at the production line such as breakdown of the machine. The project has started with identifying problem at the AMM plant focus at the Trim and Finale Department. Then, the data has been analyzed by using Total Quality Management Tools such as fishbone diagram and Pareto chart. From the analysis, the main problem is come from two type of the machine which is the mount lift and overhead pulley. The losses will affect the losses to the company. Some lean tools are suggested to overcome the problems which are Total Productive Maintenance (TPM), Standardized Work, Continuous Improvement, 5S and others. There are the advantages of applying lean methodology to the car production such as increase worker’s discipline, eliminate the waste, and improve the quality of the product and others. There are some limitation of applying the lean methodology such as setup cost, cooperation within the administrator and operator and the company rules and policy. By applying the lean tools, the problem can be minimized and gain the high profit at the same time. The lean tools only can be suggested without implementation because of the rules and policy of the company.
650 0 _aAutomobiles factories
650 0 _aProcess control
650 0 _aManufacturing processes
999 _aVIRTUA40
_c2643
_d2649
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*6502*9992