000 02463nam a2200253 a 4500
001 vtls000040695
003 KUKTEM
005 20251114204455.0
008 090722t2008 my ao f m 000 0 eng d
020 _aTHE0007659(Local)
039 9 _a201905171213
_bfawwaz
_c201107132243
_dVLOAD
_c200908141650
_dVLOAD
_c200908141631
_dVLOAD
_y200907221303
_zkam
040 _aUMP
090 _aTS183 .S58 2008 rs Bc.
100 0 _aWan Muhammad Shukri Wan Zainal Abidin
245 1 0 _aImplementation of lean practices in small and medium enterprise /
_cWan Muhammad Shukri Bin Wan Zainal Abidin
246 3 _aImplementation of lean practices in small and medium enterprise
_h[electronic resource]
260 _aKuantan, Pahang :
_bUMP,
_c2008
300 _a45 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 computer disc
502 _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008
520 3 _aThis thesis deals with the wastes in a SME company which is PJ Foods Industries Sdn. Bhd. The objective of this study is to apply the lean manufacturing concept, principles and tools to eliminate and reduce the occurred wastes in PJ Foods Industries Sdn. Bhd. Movement waste, waiting waste and motion waste were subject that being studied in this thesis. Several visits have been done and the data were collected through interview, observation, pictures and calculating the current total production time of 7kg fried chicken flour product. Materials flow in the original layout, process maps and simulation on the original layout using Witness Software were used to determine the section or process that has highest idle percentage or wastes. Witness Software was also used to simulate the improvement layout and it was found that the improvements on layout managed to eliminate the movement waste and reducing other existing waste as well as reduce the total production time by 2.31% for every 20 packets. For the inventories of finished products, 5S is the best method to improve and establish better workplace and housekeeping conditions. It is recommended that the suggestions in this thesis be applied in actual condition at PJ Foods Industries Sdn. Bhd in the next stage of the study.
650 0 _aProduction management
650 0 _aFactory and trade waste
_xManagement
999 _aVIRTUA40
_c2663
_d2669
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5200*6500*6501*9992