000 02158nam a2200253 a 4500
001 vtls000055048
003 KUKTEM
005 20251114204502.0
008 110722t2009 my a f m 000 0 eng d
020 _aTHE0006808(Local)
039 9 _a201905291147
_bamirul
_y201107221711
_zida
040 _aUMP
090 _aTK3111 .S53 2010 rs Bc.
100 0 _aShahida Mohd Said @ Sayed
245 1 0 _aStatic and dynamic impact of HVDC, TNB-EGAT interconnection system /
_cShahida Mohd Said @ Sayed
246 3 _aStatic and dynamic impact of HVDC, TNB-EGAT interconnection system
_h[computer file]
260 _aKuantan, Pahang :
_bUMP,
_c2010
300 _axv, 72 p. :
_bill. (some col.) ;
_c30 cm. + 1 computer disc
502 _aProject paper (Bachelor of Electrical Engineering (Power System)) -- Universiti Malaysia Pahang - 2010
504 _aBibliography : p. 68-70
520 3 _aHVDC interconnection TNB-EGAT system is the second stage of the grid interconnection between Malaysia and Thailand. This system is to export the electrical power during lower demand and import during TNB’s peak load. The objectives of this project are to study the static and dynamic impacts of HVDC TNB-EGAT system. This study will also focus on modeling and simulating of the HVDC interconnection system by using Power System Computer Aided Design (PSCAD/EMTDC) software. The load flow analysis has been conducted by comparing the simulation from PSCAD with the actual data. Hence, the fault analysis also has been conducted by locating the fault at the HVDC modeling which is the DC line fault analysis and AC signal phase short circuit at inverter station analysis. This system is stabilized by having a transient stability analysis. The PSCAD software has the features that can be used to conduct such analysis. This analysis has been performed and the impacts have been monitored on the system and both power system utilities. From the analysis, some improvements have been suggested for the future system
650 0 _aElectric power transmission
_xDirect current
999 _aVIRTUA40
_c2844
_d2850
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5040*5200*6500*9992