000 01131nam a2200229 a 4500
001 vtls000019227
003 KUKTEM
005 20251117144304.0
008 070404t2002 nyua f 000 0 eng d
020 _a0791836185
039 9 _a201107131911
_bVLOAD
_c201012061556
_dida
_c200908141314
_dVLOAD
_c200908141245
_dVLOAD
_y200704041503
_zkam
040 _aUMP
090 _aTJ263.5 .C66 2002
245 0 0 _aConsensus for the lay-up of boilers turbines, turbine condensers, and auxiliary equipment :
_ban ASME research report /
_cprepared by the Turbine/Turbine Condenser Lay-Up Task Group and Boiler Lay-Up Task Group, for the Water Technology Subcommittee of the ASME Research and Technology Committee on Water and Steam in Thermal Systems
260 _aNew York, N.Y. :
_bAmerican Society of Mechanical Engineers,
_c2002
300 _a60 p. :
_bill. ;
_c21 cm.
440 0 _aCRTD ;
_vvol. 66
650 0 _aBoilers
_xMaintenance and repair
650 0 _aTurbines
_xMaintenance and repair
650 0 _aCondensers (Steam)
_xMaintenance and repair
999 _aVIRTUA40
_c33229
_d33235
999 _aVTLSSORT0080*0200*0400*0900*2450*2600*3000*4400*6500*6501*6502*9991