000 02117nam a2200241 a 4500
001 vtls000065312
003 KUKTEM
005 20251114204521.0
008 121022t2012 my da f m 000 0 eng d
020 _aTHE0005557(Local)
039 9 _a201905161433
_bhanafiah
_c201211071242
_dhuda
_c201210231102
_dhuda
_y201210221300
_zhuda
040 _aUMP
090 _aT56.8 .R35 2012 rs Bc.
100 0 _aSiti Raihana Shahadan
245 1 0 _aSurvey of project management methods which employed by fixed position layout in Malaysia /
_cSiti Raihana Shahadan
260 _aKuantan, Pahang :
_bUMP,
_c2012
300 _axvi, 53 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
504 _aIncludes bibliography
520 _aThis thesis presents the survey on the project management methods which employed in fixed-position layout in Malaysia. The objectives of this research are to investigate the type of project management methodology and tools, the factors considered in project management methods and the performance of project management methods implemented in fixed- position layout (construction) in Malaysia. A questionnaire survey about project management methods were conducted at construction companies. Critical path method (CPM), Program Evaluation & Review Technique (PERT) and graphical evaluation & review technique (GERT) have been chosen as predictors in order to predict which project management method most suitable to be employed in fixed-position layout. The survey shows that the most significant method is CCPM and for tools is PERT followed by CPM and lastly GERT. CPM and PERT analysis were implemented to one of the construction project. As a conclusion, by having a good project management system such as CPM and PERT, the fixed position layout industry can strive for better improvement, redefine its image and steer itself in meeting a success in near future.
650 0 _aProject management
999 _aVIRTUA40
_c3394
_d3400
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992