100 0 _aMuhammad Quyyum Sohaimi
245 1 0 _aAnalysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd. /
_cMuhammad Quyyum Sohaimi
260 _aKuantan, Pahang :
_bUMP,
_c2012
300 _axiv, 77 p. ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
504 _aBibliography : p. 75-76
520 _aToyota Production System (TPS) is derived from Toyota's original idea was just in time (JIT) which it is the idea of sakiichi Toyoda, Toyoda kinchiri their engineers, taiichi Ohno. Objective of this system is to design out a muda (waste), mura (inconsistency) and muri (work load). In Malaysia this system at first adopted in the automotive industry, especially in Proton and Perodua as well as their vendors. Hicom Teck See (M) Sdn. Bhd. is one of the Proton and Perodua vendors that produce parts made from plastic as the front bumper. From the results of evaluation of LPS in May 2011, Takt Production showed the lowest criteria, in order to solve this problem one of the seven QC tools are used, next by used CFMEA and FMEA for determined the potential of the root causes why the production is the lowest criteria. By obtaining these potentials occur this problem, suggestions for improving these criteria are shown. By taking one of the products produced Hicom Teck See, a case study have been done. For this case study, a visits to Hicom Teck See have been done, all data on these products is taken to produce a proposal. The proposal is expected to improve Takt production criteria, and thus increase the score assessment of LPS in the next evaluation. By prepare proposals, Hicom Teck can see self-improvement / kaizen at work stations to reduce the lead time to customers and reduce the workload on the operator.
650 0 _aProduction control
650 0 _aProduction management
999 _aVIRTUA40