000 00843nam a2200241 a 4500
001 vtls000021611
003 KUKTEM
005 20251117144409.0
008 071004s2007 nyu 001 0 eng|d
020 _a0071486607
039 9 _a201107131932
_bVLOAD
_c200908141341
_dVLOAD
_c200908141313
_dVLOAD
_c200908131718
_dVLOAD
_y200710041236
_zsri
040 _aUMP
090 _aTH438.4 .W55 2007
100 1 _aWoof, Murray B
245 1 _aFaster construction projects with CPM scheduling /
_cMurray B. Woolf
260 _aNew York :
_bMc Graw Hill ,
_cc2007
300 _axliii, 412p. :
_bill. ;
_c24 cm.
500 _aIncludes index
650 0 _aBuilding
_xSuperintendence
650 0 _aProduction scheduling
650 0 _aCritical path analysis
999 _aVIRTUA40
_c35479
_d35485
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*6500*6501*6502*9991