| 000 | 01984nam a2200253 a 4500 | ||
|---|---|---|---|
| 001 | vtls000065324 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204527.0 | ||
| 008 | 121022t2012 my da f m 000 0 eng d | ||
| 020 | _aTHE0007497(Local) | ||
| 039 | 9 |
_a201905161436 _bfawwaz _c201211081437 _dhuda _c201211071250 _dhuda _y201210221707 _zhuda |
|
| 040 | _aUMP | ||
| 090 | _aTS155.8 .N38 2012 rs Bc. | ||
| 100 | 0 | _aMuhamad Nasruldin Hashim | |
| 245 | 1 | 0 |
_aImplementation of single minute exchange die (SMED) technique to accelerate the mold changing time at sme company / _cMuhamad Nasruldin Hashim |
| 260 |
_aKuantan, Pahang : _bUMP, _c2012 |
||
| 300 |
_axiv, 84 p. : _bill. (some col.) ; _c30 cm. + _e1 CD-ROM |
||
| 502 | _aProject paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 | ||
| 504 | _aBibliography : p. 73-76 | ||
| 520 | _aThe purpose of the Single Minute Exchange Die (SMED) is to eliminate waste of time. Longer set-up time means that the production line is not productive and will left behind by their competitor. Nowadays, everything is been done faster and just-in-time, where manufactures need to produced product in fast and without neglecting the quality issue and deliver it to customer right on time. In this project, SMED had provided the method to eliminate waste of time with their eight technique of SMED introduced by Mr. Shigeo Shingo. In SMED mold or die exchange should be less in 10minute and it took lots of improvement involve by the employee. The project objective is to reduce mold set-up time to 40% is exceeding the expectation where they able to reduce until 51% from the total setup time previously. In overall with the help of everyone, especially from top management of company to their employee, SMED is successfully done and achieve the objective. | ||
| 650 | 0 | _aProduction control | |
| 650 | 0 | _aProduction management | |
| 999 |
_aVIRTUA40 _c3571 _d3577 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992 | ||