000 01984nam a2200253 a 4500
001 vtls000065324
003 KUKTEM
005 20251114204527.0
008 121022t2012 my da f m 000 0 eng d
020 _aTHE0007497(Local)
039 9 _a201905161436
_bfawwaz
_c201211081437
_dhuda
_c201211071250
_dhuda
_y201210221707
_zhuda
040 _aUMP
090 _aTS155.8 .N38 2012 rs Bc.
100 0 _aMuhamad Nasruldin Hashim
245 1 0 _aImplementation of single minute exchange die (SMED) technique to accelerate the mold changing time at sme company /
_cMuhamad Nasruldin Hashim
260 _aKuantan, Pahang :
_bUMP,
_c2012
300 _axiv, 84 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
504 _aBibliography : p. 73-76
520 _aThe purpose of the Single Minute Exchange Die (SMED) is to eliminate waste of time. Longer set-up time means that the production line is not productive and will left behind by their competitor. Nowadays, everything is been done faster and just-in-time, where manufactures need to produced product in fast and without neglecting the quality issue and deliver it to customer right on time. In this project, SMED had provided the method to eliminate waste of time with their eight technique of SMED introduced by Mr. Shigeo Shingo. In SMED mold or die exchange should be less in 10minute and it took lots of improvement involve by the employee. The project objective is to reduce mold set-up time to 40% is exceeding the expectation where they able to reduce until 51% from the total setup time previously. In overall with the help of everyone, especially from top management of company to their employee, SMED is successfully done and achieve the objective.
650 0 _aProduction control
650 0 _aProduction management
999 _aVIRTUA40
_c3571
_d3577
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992