| 000 | 00814nam a2200217 a 4500 | ||
|---|---|---|---|
| 001 | vtls000022233 | ||
| 003 | KUKTEM | ||
| 005 | 20251117144425.0 | ||
| 008 | 071112s2002 nju f 001 0 eng|d | ||
| 020 | _a0471184063 | ||
| 039 | 9 |
_a201107131938 _bVLOAD _c200908141349 _dVLOAD _c200908141321 _dVLOAD _c200908131722 _dVLOAD _y200711121447 _zkam |
|
| 040 | _aUMP | ||
| 090 | _aQA76.54 .C44 2002 | ||
| 100 | 1 | _aCheng, Albert M. K. | |
| 245 | 1 | 0 |
_aReal-time systems : _bscheduling, analysis, and verification / _cAlbert M.K. Cheng |
| 260 |
_aHoboken, NJ : _bWiley-Interscience, _c2002 |
||
| 300 |
_a524 p. : _bill. ; _c25 cm. |
||
| 650 | 0 | _aReal-time data processing | |
| 856 | 4 | 2 | _ahttp://www.loc.gov/catdir/toc/wiley031/2003268015.html |
| 999 |
_aVIRTUA40 _c36036 _d36042 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*6500*8560*9991 | ||