000 01000nam a2200253 a 4500
001 vtls000066820
003 KUKTEM
005 20251114204531.0
008 121122t2012 my da f m 000 0 eng d
020 _aTHE0007489(Local)
039 9 _a201905161329
_bfawwaz
_c201212051020
_dhuda
_y201211221601
_zhuda
040 _aUMP
090 _aTS155 .N35 2012 rs Bc.
100 0 _aNajibah Anuar
245 1 4 _aThe study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn. Bhd. /
_cNajibah Anuar
260 _aKuantan, Pahang :
_bUMP,
_c2012
300 _axiv, 53 p. :
_bill. (some col.) ;
_c30 cm.
502 _aProject paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
504 _aBibliography : p. 51-52
650 0 _aProduction management
650 0 _aProduction control
650 0 _aIndustrial productivity
999 _aVIRTUA40
_c3686
_d3692
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*6500*6501*6502*9992