| 000 | 01752nam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | vtls000067500 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204533.0 | ||
| 008 | 121206t2012 my da f m 000 0 eng d | ||
| 020 | _aTHE0002365(Local) | ||
| 039 | 9 |
_a201905271203 _bshamsul _c201301081226 _dhuda _y201212061547 _zhuda |
|
| 040 | _aUMP | ||
| 090 | _aT57.84 .K64 2012 rs Bc. | ||
| 100 | 1 | _aKoh, Desmond Chong Shin | |
| 245 | 1 | 0 |
_aTransport scheduling system in SUK Pahang using heuristic method / _cDesmond Koh Chong Shin |
| 260 |
_aKuantan, Pahang : _bUMP, _c2012 |
||
| 300 |
_axvi, 95 p. : _bill. ; _c30 cm. + _e1 CD-ROM |
||
| 502 | _aProject paper (Bachelor of Computer Science (Software Engineering)) -- Universiti Malaysia Pahang - 2012 | ||
| 504 | _aBibliography : p. 81-82 | ||
| 520 | 3 | _aTransport Scheduling System in SUK Pahang is a system design using Heuristic Method (HM). The system was built to enhance the schedule options by giving fair equalizer in using the resources such as drivers and transports. Personnel scheduling problems deal with the issue of assigning drivers and vehicles to shifts in a certain time period for the journey, such that several regulations are satisfied and preferences of the drivers and vehicles are taken into account, level of service is maximized [1]. The scheduling system will be based on mathematical programming for optimization. As we know, HM has been variously presented in many kinds of form such as filtering, criteria, production rules, and procedure [3]. In this scheduling system, filtering, procedures, and criteria which base on the constraints will be used using HM. | |
| 650 | 0 | _aHeuristic programming | |
| 999 |
_aVIRTUA40 _c3741 _d3747 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992 | ||