000 02614nam a2200265 a 4500
001 vtls000069321
003 KUKTEM
005 20251114204535.0
008 130329t2012 my a f m 000 0 eng d
020 _aTHE0007642(Local)
039 9 _a201905171203
_bfawwaz
_y201303291122
_zFida
040 _aUMP
090 _aTS178 .M84 2012 rs Bc.
100 0 _aSyed Muhammad Adib Syed Mohd Zaki
245 1 0 _aProductivity improvement via simulation in manufacturing industry /
_cSyed Muhammad Adib Syed Mohd Zaki
260 _aKuantan, Pahang :
_bUMP,
_c2012
300 _axiv,83 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
504 _aBibliography : p. 76-77
520 3 _aProductivity improvement effort such as better layout arrangement, minimize the total production cost or maximize the throughput had been given great attentions in today manufacturing industries. However, to execute such improvements involve a big amount of money which normally be the cause that obstruct the improvements. Simulation has become one of the solutions to this problem and rapidly gaining the industry confident nowadays. This study aims to make improvement in terms of the company’s production layout which focusing to the sandwich bread production line. The study is conducted at Roti Temerloh Enterprise, a company which produces products such as sandwich breads, buns and cakes. Being considered as one of the Small and Medium Enterprises (SMEs), cost certainly be the big issues when improvement planning to be considered. Using WITNESS simulation software, the production of the sandwich bread will be modeled and some adjustment then reviewed through the simulation to come up with the improved alternatives layouts. Comparison analysis is carried out and the results show in increased of production up to 265 breads per day for alternative 1 and 581 breads per day for alternative 2 and 3. Machine utilization in term of idle time, busy time and blocked for; Alternative 1 86.69%, 13.49% and 0.49%, Alternative 2 66.49%, 26.82% and 6.69%, Alternative 3 69.64%, 25.04% and 5.32%. From the cost effectiveness analysis, the cost is RM2.06 per unit for Alternative 1 and RM1.49 per unit for Alternatives 2 and 3. Thus the suggested alternative is Alternative 3.
650 0 _aPlant layout
_xPlanning
650 0 _aIndustrial floor space
650 0 _aIndustrial productivity
999 _aVIRTUA40
_c3797
_d3803
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*6502*9992