000 02087nam a2200265 a 4500
001 vtls000045847
003 KUKTEM
005 20251114204543.0
008 100519t2009 my ao f m 000 0 eng d
020 _aTHE0007649(Local)
039 9 _a201905171208
_bfawwaz
_c201107132320
_dVLOAD
_c201103101321
_dida
_y201005191636
_ztraining
040 _aUMP
090 _aTS178.4 .K33 2009 rs Bc.
100 0 _aMohamed Kader Maidin Y. Shahari
245 1 0 _aRedesign of Takada radio using Boothroyd Dewhurst DFA method /
_cMohamed Kader Maidin Bin Y. Shahari
246 3 _aRedesign of Takada radio using Boothroyd Dewhurst DFA method
_h[electronic resource]
260 _aKuantan, Pahang :
_bUMP,
_c2009
300 _axvii, 105 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 computer disc
502 _aProject paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2009
504 _aBibliography : p. 90-91
520 3 _aThe present paper discusses the Boothroyd Dewhurst DFA method that been used to evaluate a radio named Takada radio based on assembly efficiency. A survey conducted by distributing questionnaire about Takada radio to the university students and manufacturing company workers. Original design of Takada radio is analyzed and redesign of Takada radio is created based on improved assembly efficiency. Main thing evaluated in this project on Takada radio is the total assembly time and cost, and percentage of design efficiency. ALGOR software analysis is used to evaluate the reliability of the integral fasteners that have been designed in the redesign of Takada radio. The integral fasteners are analyzed on whether it will break or failure under range of forces acted on the integral fasteners. The redesign of Takada radio with the higher percentage value of design efficiency is selected as the best design in term of its assembly efficiency.
650 0 _aAssembly-line methods
650 0 _aProduction engineering
999 _aVIRTUA40
_c4018
_d4024
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5020*5040*5200*6500*6501*9992