| 000 | 01030nam a2200277 a 4500 | ||
|---|---|---|---|
| 001 | vtls000031558 | ||
| 003 | KUKTEM | ||
| 005 | 20251117145159.0 | ||
| 008 | 080911s1996 flua 001 0 eng | ||
| 020 | _a0824797159 (alk. paper) | ||
| 039 | 9 |
_a201107132044 _bVLOAD _c200908141518 _dVLOAD _c200908141448 _dVLOAD _c200908132027 _dVLOAD _y200809111244 _znadia |
|
| 040 | _aUMP | ||
| 090 | _aTA177.4 .E36 1996 | ||
| 245 | 0 | 0 |
_aEffective project management through applied cost and schedule control / _cedited by James A. Bent, Kenneth K. Humphreys. |
| 260 |
_aBoca Raton, FL : _bCRC Press, _cc1996. |
||
| 300 |
_axvi, 456 p. : _bill. ; _c29 cm. |
||
| 440 | 0 |
_aCost engineering ; _v26 |
|
| 500 | _aIncludes index. | ||
| 650 | 0 | _aEngineering economy. | |
| 650 | 0 | _aProject management. | |
| 650 | 0 | _aCost control. | |
| 650 | 0 | _aProduction scheduling. | |
| 700 | 1 | _aBent, James A | |
| 700 | 1 | _aHumphreys, Kenneth King. | |
| 999 |
_aVIRTUA40 _c41023 _d41029 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*2450*2600*3000*4400*5000*6500*6501*6502*6503*7000*7001*9991 | ||