000 01387nam a2200265 a 4500
001 vtls000026493
003 KUKTEM
005 20251117145224.0
008 080414t2004 xxuao f 001 0 eng d
020 _a0784407312
039 9 _a201107132051
_bVLOAD
_c200908141527
_dVLOAD
_c200908141458
_dVLOAD
_c200908132033
_dVLOAD
_y200804141020
_zsufarini
040 _aUMP
090 _aTA660.P55 M53 2004
110 1 _aMichigan State University. Center for Underground Infrastructure Research and Education
245 1 0 _aHorizontal auger boring projects /
_cprepared by the Center for Underground Infrastructure Research and Education (CUIRE), Michigan State University under the direction of the Horizontal Auger Boring Task Force of the Committee on Trenchless Installation of Pipelines (TIPS) of the Ppeline Division of the American Society of Civil Engineers
260 _aReston, VA :
_bASCE ,
_cc2004
300 _axii, 52 p. :
_bill. ;
_c23 cm.
440 0 _aASCE manuals and reports on engineering practice ;
_vno. 106
504 _aIncludes bibliographical references and index
650 0 _aPipelines
_xDesign and construction
650 0 _aTrenchless construction
650 0 _aBoring
710 2 _aAmerican Society of Civil Engineers.
_bHorizontal Auger Boring Task Force
999 _aVIRTUA40
_c41825
_d41831
999 _aVTLSSORT0080*0200*0400*0900*1100*2450*2600*3000*4400*5040*6500*6501*6502*7100*9991