000 01722nam a2200253 a 4500
001 vtls000075916
003 KUKTEM
005 20251114204551.0
008 131107t2013 my da f m 000 0 eng d
020 _aTHE0003181(Local)
039 9 _a201905161434
_bzul
_c201311131650
_dnabilah
_y201311071618
_znabilah
040 _aUMP
090 _aTD449.5 .G63 2013 rs Bc.
100 1 _aGo, Bee Chew
245 1 0 _aWastewater treatment by continuous stirred tank reactor (CSTR) /
_cGo Bee Chew
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axiv, 56 p. :
_bill. ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Chemical Engineering) -- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 43-47
520 3 _aThe adsorption has been used for the industrial wastewater treatment, the batch and continuous studies were done. The aim of this study is to develop a new adsorption reactor to continuous removal of the contaminants which is the Continuous Stirred Tank Reactor (CSTR). The adsorbent used was the powdered activated carbon. By the batch studies, the equilibrium and kinetic parameters have been evaluated. Langmuir isotherm was been represented for equilibrium data and the ‘unified approach model’ which recently developed was been used to represent the kinetic data. The CSTR performance was studied and found that the CSTR operates as an ideal CSTR. Effect of initial concentration, contact time and adsorbent dosing rate on the dye removal efficiency in CSTR unit has been investigated.
650 0 _aWater
_xPurification
_xAdsorption
650 0 _aChemical reactors
999 _aVIRTUA40
_c4242
_d4248
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992