000 01945nam a2200265 a 4500
001 vtls000075698
003 KUKTEM
005 20251114204554.0
008 131022t2012 my a f m 000 0 eng d
020 _aTHE0006702(Local)
039 9 _a201905171518
_bamirul
_y201310221053
_zFida
040 _aUMP
090 _aTK1087 .A36 2012 rs Bc.
100 0 _aNoor Ain Izzati Rahim
245 1 0 _aWind turbine charge controller /
_cNoor Ain Izzati Rahim
260 _aKuantan, Pahang :
_bUniversiti Malaysia Pahang,
_c2012
300 _axiii, 63 p. :
_bill. ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Electrical Engineering (Power Systems)) -- Universiti Malaysia Pahang - 2012
504 _aBibliography : p. 46
520 3 _aWind energy is become the world’s fastest growing energy source as it meets the environmental concern on the clean generation of electricity. Nowadays, the available wind turbines are optimized to produce maximum power output under limit of wind speeds. Conversely, universal wind turbine charger is not suitable to be used in certain area cause by the rapidly changed of the wind speeds. Throughout this project, wind turbine will be design carefully, select the appropriate battery and control the charging system by diverting excess power to a dump load (could be anything such as light bulb, water heater and etc). The wind source used in experimental will be replaced by the power supply by varying the voltage and current source to see the charging rate controlled by the wind turbine charge controller. This technique should be able to keep the wind turbine in superior performance and prevent from overcharged. Without a doubt, it is safe and economic to be executed.
650 0 _aPhotovoltaic power
650 0 _aPhotovoltaic cells
650 0 _aHybrid power systems
999 _aVIRTUA40
_c4334
_d4340
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*6502*9992