| 000 | 01080nam a2200277 a 4500 | ||
|---|---|---|---|
| 001 | vtls000032425 | ||
| 003 | KUKTEM | ||
| 005 | 20251117145321.0 | ||
| 008 | 081118t2007 nyua f 001 0 eng d | ||
| 020 | _a9780387476872 | ||
| 020 | _a0387476873 (hardcover : alk. paper) | ||
| 039 | 9 |
_a201107132114 _bVLOAD _c201008201154 _dida _c200908141558 _dVLOAD _c200908141531 _dVLOAD _y200811181519 _zshah |
|
| 040 | _aUMP | ||
| 090 | _aHD38.5 S37 2007 | ||
| 100 | 1 | _aSarin, Subhash C. | |
| 245 | 1 | 0 |
_aFlow shop lot streaming / _cSubhash C. Sarin, Puneet Jaiprakash |
| 260 |
_aBerlin : _bSpringer , _c2007 |
||
| 300 |
_axi, 253p. : _bill. ; _c24 cm. |
||
| 504 | _aIncludes bibliographical references and index | ||
| 650 | 0 | _aProduction control | |
| 650 | 0 |
_aProduction control _xMathematical models |
|
| 650 | 0 | _aManufacturing processes | |
| 650 | 0 | _aProduction planning | |
| 856 | 4 | 1 |
_3Table of contents only _uhttp://www.loc.gov/catdir/enhancements/fy0825/2007920043-t.html |
| 999 |
_aVIRTUA40 _c43786 _d43792 |
||
| 999 | _aVTLSSORT0080*0200*0201*0400*0900*1000*2450*2600*3000*5040*6500*6501*6502*6503*8560*9991 | ||