100 0 _aMazliani Ismail
245 1 0 _aAnalyzing non-value added process at bi technologies corporation sdn. Bhd in order to improve plant layout for Hm72a-10 series (flat wire) model /
_cMazliani Ismail
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axiv, 63 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Engineering in Manufacturing) -- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 61
520 3 _aThis project presents a research to analyze Non-Value added process at BI Technologies Corporation Sdn. Bhd in order to improve its layout for HM72A-10 Series (Flat Wire) model. In this case study, distance travelled, cross flow, backtracking and its flow time in present layout was studied. The detailed studies of the layout such as operation process chart, flow of material and activity relationship chart have been investigated. The new layout have been designed and compared with the present layout. In addition, two alternative layouts were developed and evaluated by using non-value added process, flow of time and material handling distance as a criterion. The improved layouts could reduce the excessive movement 60.19% to 67.65% and the selected layout can reduce distance from 236.6 meters to 78.9 meters. As a result, the systematic layout planning pattern theory (SLP) showed that new layout significantly decrease the distance of material flow, cross flow and backtracking from receiving process until packaging.
650 0 _aPlant layout