000 00919nam a2200241 a 4500
001 vtls000076427
003 KUKTEM
005 20251114204608.0
008 131220t2012 my da f m 000 0 eng d
020 _aTHE0002926(Local)
039 9 _a201905131620
_bzul
_y201312201145
_znabilah
040 _aUMP
090 _aTA760 .A55 2012 rs Bc.
100 0 _aNur Anis Adlina Mat Noor
245 1 0 _aSettlement of an embankment treated with preloading and prefabricated vertical drain of east-coast highway phase 2 (a case study) /
_cNur Anis Adlina Mat Noor
260 _aKuantan, Pahang :
_bUMP,
_c2012
300 _axi, 71 p. :
_bill. ;
_c30 cm.
502 _aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2012
650 0 _aEmbankments
650 0 _aSoil mechanics
650 0 _aDrainage
999 _aVIRTUA40
_c4769
_d4775
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*6500*6501*6502*9992