000 02441nam a2200241 a 4500
001 vtls000076648
003 KUKTEM
005 20251114204610.0
008 140124t2013 my a f m 000 0 eng d
020 _aTHE0001761(Local)
039 9 _a201905131226
_byusri
_y201401241523
_zFida
040 _aUMP
090 _aQA76.76.A65 C44 2013 rs Bc.
100 1 _aCheong, Siow Chee
245 1 0 _aStudent time management application /
_cCheong Siow Chee
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axii, 69 p. :
_bill. ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Computer Science (Graphic & Multimedia Technology) -- Universiti Malaysia Pahang - 2013
504 _aBibliography : p. 53-54
520 3 _aStudent Time Management Application is developed to manage student time. There are many existing time management application. However, the existing applications do not determine the priority of task. The main problem that student face is student does not know which task has the higher priority when there are many tasks given at the same time. Hence, this project is carried out to develop a prototype for student time management by considering 5 criteria (credit hour, percentage of assignment, deadline, estimated time require, and task status) in prioritizing student tasks. Prototyping methodology is used in implementing in this system design. In the first process of prototyping, thirty respondents were randomly selected to complete a survey questionnaire to identify the basic requirements needed. Then, the factors (credit hour, percentage of assignment, deadline of task, estimation of time required to complete the task and status of task) that will affect the priority will be inserted by user, analyze and calculate by the application using algorithm and produce the final output which determines the weight of priority of each task. Next, using reversed selection sort concept, the application will sort the task accordingly after determine the priority of each task. Testing process is done based on the calculation of the 5 criteria and the result show 90% of the result is logic and satisfied. Inconclusion, this project is expected to help student manage their time by determining the priority of a task based on the five criteria mentioned.
650 0 _aApplication software
_xDevelopment
999 _aVIRTUA40
_c4849
_d4855
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992