000 01268nam a2200301 a 4500
001 vtls000027609
003 KUKTEM
005 20251117145551.0
008 080509s1989 maua 001 0 eng
020 _a9780915299171
020 _a0915299178 :
_c$44.95
039 9 _a201107132239
_bVLOAD
_c200908141436
_dVLOAD
_c200908141407
_dVLOAD
_c200908131751
_dVLOAD
_y200805091128
_znorsaini
040 _aUMP
090 _aTS157 .S55 1989
100 1 _aShing¯o, Shigeo,
_d1909-1990
240 1 0 _aToyota seisan h¯oshiki no IE-teki k¯osatsu.
_lEnglish
245 1 2 _aA study of the Toyota production system from an industrial engineering viewpoint /
_cShigeo Shingo ; newly translated by Andrew P. Dillon ; with a foreword by Norman Bodek.
250 _aRev. ed.
260 _aCambridge, Mass. :
_bProductivity Press,
_cc1989.
300 _axxxiv, 257 p. :
_bill. ;
_c24 cm.
500 _aTranslation of: Toyota seisan h¯oshiki no IE-teki k¯osatsu.
500 _aIncludes index.
610 2 0 _aToyota Jid¯osha K¯ogy¯o Kabushiki Kaisha.
650 0 _aProduction control.
650 0 _aJust-in-time systems.
700 1 _aDillon, Andrew P.
999 _aVIRTUA40
_c48962
_d48968
999 _aVTLSSORT0080*0200*0201*0400*0900*1000*2400*2450*2500*2600*3000*5000*5001*6500*6501*6100*7000*9991