000 01884nam a2200241 a 4500
001 vtls000078153
003 KUKTEM
005 20251114204613.0
008 140509t2013 my a f m 000 | eng d
020 _aTHE0007637(Local)
039 9 _a201905171200
_bfawwaz
_y201405091606
_ztraining3
040 _aUMP
090 _aTS178 . A35 2013 rs Bc.
100 0 _aNur Afiqah Noor Azman
245 1 0 _aOptimize flow layout and analysis of effectiveness at bi technologies Corporation sdn. Bhd /
_cNur Afiqah Noor Azman
260 _aa Kuantan, Pahang :
_bUMP,
_c2013
300 _axv, 55 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor of Engineering in Manufacturing) -- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 74-76
520 3 _aAgilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that decreases product travel distances, cross flow and increases productivity as well as effectiveness of the proposed optimization analysis. Major modification of the cell decisions include downsizing the existing cell, sorting to find waste in material handling and establishing a clear process/product flows. The proposed plant optimization was analysis and results yield 100% productivity. The percentage efficiency of the optimize flow layout is 80% compared to 67% in existing flow layout. The analysis of efficiency has been increased to 13% in the proposed process flow. The product travel distance also has been reduced from 93 feet’s to 20 feet’s.
650 0 _aPlan Layout
999 _aVIRTUA40
_c4922
_d4928
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992