| 000 | 03021ntm a2200241 a 4500 | ||
|---|---|---|---|
| 001 | vtls000079257 | ||
| 003 | KUKTEM | ||
| 005 | 20251114204615.0 | ||
| 008 | 140602t2013 my a f m 000 0 eng d | ||
| 020 | _aTHE0006670(Local) | ||
| 039 | 9 |
_a201905171128 _bamirul _c201406061010 _dtraining1 _c201406021352 _dtraining1 _c201406021351 _dtraining1 _y201406021343 _ztraining1 |
|
| 040 | _aUMP | ||
| 090 | _aTK454.4.M3 I99 2013 rs Dip. | ||
| 100 | 0 | _aMohammad Izzat Junid | |
| 245 | 1 | 0 |
_aFabrication of on/off magnetic clamp for welding process / _cMohammad Izzat Junid |
| 260 |
_aKuantan, Pahang : _bUMP , _c2013 |
||
| 300 |
_axi, 32 p. : _bill. (some col.) ; _c30 cm. + _e1 CD-ROM |
||
| 502 | _aProject paper (Diploma of Mechanical Engineering)-- Universiti Malaysia Pahang – 2013 | ||
| 504 | _aBibliography : p. 32 | ||
| 520 | 3 | _athesis is regarding the final year project for diploma student in University Malaysia Pahang (UMP).The title is fabrication of on/off magnetic clamp for welding process.The student needs to design and fabricate a magnetic clamp for welding process.The magnetic clamp must low in cost of production and doesn’t give damage to the workpiece.It is to overcome the problem that arise such as the current magnetic clamp are expensive and the other clamp such as table clamp and portable clamp can give damage to the workpiece. The student needs to use various fabrication processes in the making of this project. All the skill had been taught in previous lab courses in UMP.Firstly, the work must be plan well so the work can be finished in time.A Gantt chart is constructed in order to show the date and time for the specific work to be done. Moreover, a flow chart is also constructed to visualize the step-by-step process of making this project. Literature review is done early to give better understanding about what is magnetic clamp.Then the student makes the sketches of the magnetic clamp. All the sketches undergo screening process and only 3 that pass the screening.The 3 sketches are then refined before final concept is selected using scoring process.The final concept is then turned into 3D drawing. The 3D drawings are generateddusing computer software. After the detail of the drawing is finished, the project is fabricated.All the process is mainly done in the fabrication lab of UMP. However, the magnet that been use for this project booked at Load Technology Engineering (M) SDN BHD at Shah Alam, Selangor. Starting from the measuring and marking process until the assembly process is done using the tools and equipment in the lab.The machine such as milling machine, lathe machine and drilling machine are used to fabricate this project. Lastly the project is tested to make sure the magnetic clamp can function well.The project has work successfully.However, there is still has a low of the magnetizing power even the magnetic clamp in the off state. | |
| 650 | 0 | _aMagnetic fields | |
| 999 |
_aVIRTUA40 _c4983 _d4989 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992 | ||