000 01725ntm a2200253 a 4500
001 vtls000079290
003 KUKTEM
005 20251114204615.0
008 140602t2013 my a f m 000 0 eng d
020 _aTHE0006446(Local)
039 9 _a201905141132
_bamirul
_c201406061013
_dtraining1
_c201406021443
_dtraining1
_y201406021443
_ztraining1
040 _aUMP
090 _aTJ930 .A36 2013 rs Dip.
100 0 _aAhmad Ikmal 'Akif Abdul Khalil
245 1 0 _aDesign and fabrication of smoke piping system /
_cAhmad Ikmal 'Akif Abdul Khalil
260 _aKuantan, Pahang :
_bUMP ,
_c2013
300 _avi, 41 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Diploma of Mechanical Engineering)-- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 35
520 3 _aThis report shows the design and fabrication of smoke piping system.The problem from the instrument is the smoke flow is late to fill the air smoke rig. It fills the rig with natural pressure come from smoke generator. It takes a long time to fill it.The objective of the report are to make the smoke go more faster to air flow bench and to control volume enter the air flow bench using toggle switch.Design generation is showed and solid three dimensional structures modeling of the smoke piping system was developed with SolidWorks software. The result from testing the smoke piping system shows that the system able to suck smoke in short duration. Ideas for improvement for the smoke piping system also provided to further improve the smoke piping system.
650 0 _aPiping
_xSystem
650 0 _aPiping
999 _aVIRTUA40
_c4985
_d4991
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992