000 01163nam a2200313 a 4500
001 vtls000037361
003 KUKTEM
005 20251117150040.0
008 090609t2009 xxk f 001 0 eng d
020 _a9781405118156 (hbk)
039 9 _a201107132259
_bVLOAD
_c200911131130
_dida
_c200908141625
_dVLOAD
_c200908141558
_dVLOAD
_y200906090932
_zsaini
040 _aUMP
090 _aKD1641 .E34 2009
100 1 _aEggleston, Brian
245 1 0 _aLiquidated damages and extensions of time :
_bin construction contracts /
_cBrian Eggleston
250 _a3rd ed.
260 _aOxford :
_bWiley-Blackwell ,
_cc2009
300 _aviii, 394 p. :
_bill. ;
_c26 cm.
504 _aIncludes bibliographical references and index
650 0 _aConstruction contracts
_zEngland
650 0 _aPerformance (Law)
_zEngland
650 0 _aBreach of contract
_zEngland
650 0 _aDamages
_zEngland
650 0 _aTime (Law)
_zEngland
650 0 _aConstruction contracts
_zWales
650 0 _aPerformance (Law)
_zWales
650 0 _aDamages
_zWales
999 _aVIRTUA40
_c50306
_d50312
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2500*2600*3000*5040*6500*6501*6502*6503*6504*6505*6506*6507*9991