000 02352nam a2200253 a 4500
001 vtls000078691
003 KUKTEM
005 20251117113228.0
008 140527t2013 my a f m 000 0 eng d
020 _aTHE0007652(Local)
039 9 _a201905171209
_bfawwaz
_c201405301527
_dFida
_c201405281109
_dtraining1
_c201405271108
_dtraining1
_y201405271056
_ztraining1
040 _aUMP
090 _aTS178.5 .F37 2013 rs Bc.
100 0 _aSiti Farahin Badrul Hisham
245 1 0 _aAssembly line balancing improvement :
_ba case study in an electronic industry /
_cSiti Farahin Badrul Hisham
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axii, 63 p. :
_bill. (col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject paper (Bachelor Of Manufacturing Engineering)-- Universiti Malaysia Pahang - 2013
504 _aBibliography : p. 46-47
520 3 _aLine balancing is about arranging a production line so that there is an even flow of production from one work station to the next. Line balancing also a successful tool to reduce bottleneck by balancing the task time of each work station so that there is no delays and nobody is overburden with their task. This thesis presents a case study on a line balancing problem in an electronic company and the study focused on assembly line 11 and 12 which produced inductor model HA00-08464 LFTR. This study aims to improve the productivity and line efficiency also to recommend improvement activities based on the line balancing and analysis done in the simulation model. The simulation was done by using Tecnomatix Plant Simulation. All the data needed for the line balancing analysis was collected and a line balancing model equipped with manual calculation was done. This data gathered is then simulated in Tecnomatix Plant Simulation. Among the improvement activities conducted in order to balance the line was combining a few process into one, transformation from manual process to mechanization, and removing waste from the line. Throughout the study, three layouts were proposed. Among these three layouts only one will be proposed to the company. The layout proposed has a better line efficiency and rate of productivity.
650 0 _aAssembly line-balancing
650 0 _aAssembly line-method
999 _aVIRTUA40
_c5050
_d5056
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992