| 000 | 02251ntm a2200265 a 4500 | ||
|---|---|---|---|
| 001 | vtls000081945 | ||
| 003 | KUKTEM | ||
| 005 | 20251117113229.0 | ||
| 008 | 141016t2013 my a f m 000 0 eng d | ||
| 020 | _aTHE0007640(Local) | ||
| 039 | 9 |
_a201905171202 _bfawwaz _c201411051225 _dsafura _y201410161140 _zFida |
|
| 040 | _aUMP | ||
| 090 | _aTS178 .L56 2013 r Bc. | ||
| 100 | 1 | _aLim, Tien Yong | |
| 245 | 1 | 0 |
_aProductivity improvement through re-design workplace area / _cLim Tien Yong |
| 260 |
_aKuantan, Pahang : _bUMP, _c2013 |
||
| 300 |
_axiii, 63 p. : _bill. (some col.) ; _c30 cm. + _e1 CD-ROM |
||
| 502 | _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013 | ||
| 504 | _aBibliography : p.47-48 | ||
| 520 | 3 | _aFor industrial use, ergonomics has traditionally been used to solve the injuries problem from repetitive motion, prolonged postures, and some other physical risks. However, the utility of ergonomics is not just only limited to solve the injuries problem. Good ergonomics investment also can be applied to improve productivity. This project are carried out at Sidmann Composite Sdn Bhd. The Objective of this project are propose a new workplace with ergonomics features for Sidmann Composite Sdn. Bhd. to reduce the level of musculoskeletal risks of the workplace and improve the production process’s cycle time. In order to ensure the objectives are met. A comprehensive data collection was divided into three phase, such as phase one is to perform up-front analysis, phase two is to determine the existing working process risk and operational impact, phase three is to estimate proposed working process risk and operational impact. The assessment was carried out by Rapid Entire Body Assessment (REBA) and Strain Index (SI) to assess the level of musculoskeletal risk in this company. Methods-Time Measurement (MTM) was used to determine the labor time for the performing task improvement. Finally, existing process and proposed process was compared in this project. | |
| 650 | 0 |
_aPlant layout _xPlanning |
|
| 650 | 0 | _aIndustrial productivity | |
| 650 | 0 | _aFurniture industry and trade | |
| 999 |
_aVIRTUA40 _c5083 _d5089 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*6502*9992 | ||