000 02110ntm a2200241 a 4500
001 vtls000082871
003 KUKTEM
005 20251117113232.0
008 141103t2013 my a f m 000 0 eng d
020 _aTHE0006258(Local)
039 9 _a201905161437
_baida
_c201411131321
_dtraining1
_c201411050938
_dtraining1
_c201411050830
_dFida
_y201411031525
_ztraining1
040 _aUMP
090 _aTJ263.5 .N34 2013 r Bc.
100 0 _aMohamad Nafis Jamaluddin
245 1 0 _aImprovement of boiling process in fish cracker production /
_cMohamad Nafis Jamaluddin
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axiv, 45 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject Paper (Bachelors of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013
504 _aBibliography : p. 33-34
520 3 _aBoiling process is performed at the final stage in fish cracker processing. Long process time of boiling create bottleneck that limits daily production of fish cracker. Traditionally, the heat is produce to boil water is by burning fire woods. The invention of diesel-fired boiler has improved the process but still there are some problem occurs at the station. Therefore, a new boiler is designed to improve the boiling process by using LPG burner which has 2.9 % higher calorific value than diesel. The boiler designed must be simulated to study the heat convection inside the boiler by using SolidWorks Flow Simulation to see the temperature distribution inside the new boiler. Multiple layers bottom plate of the boiler consist of an aluminium plate sandwiched between two stainless steel plates is used to increase the rate of heat transfer from the flame into the water inside the boiler. The result from the simulation proves that the multiple layers bottom plate of the boiler has a higher rate of heat transfer than the single layer plate where the time taken for water to boil is 42.2 % shorter than the single stainless steel layer bottom plate boiler.
650 0 _aBoilers
999 _aVIRTUA40
_c5179
_d5185
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992