000 01299nam a2200289 a 4500
001 vtls000035302
003 KUKTEM
005 20251117150147.0
008 090326t2001 vaua f 101 0 eng d
020 _a9780784405710
020 _a0784405719
039 9 _a201107132330
_bVLOAD
_c201006241404
_dida
_c200908141601
_dVLOAD
_c200908141533
_dVLOAD
_y200903261037
_zsaini
040 _aUMP
090 _aTA153 .U85 2001
111 2 _aUS-Japan Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems
_n(1st :
_d2000 :
_cHonolulu, Hawaii
245 1 0 _aLife-cycle cost analysis and design of civil infrastructure systems /
_csponsored by Structural Engineering Institute of ASCE ; edited by Dan M. Frangopol, Hitoshi Furuta
260 _aReston,VA :
_b, ASCE,
_cc2001
300 _avi, 323 p. :
_bill. ;
_c22 cm.
504 _aIncludes bibliographical references and index
650 0 _aCivil engineering
_vCongresses
650 0 _aPublic works
_vCongressses
650 0 _aLife cycle costing
_vCongresses
700 1 _aFrangopol, Dan M.
700 1 _aFuruta, Hitoshi
710 2 _aStructural Engineering Institute of the American Society of Civil Engineers
999 _aVIRTUA40
_c52685
_d52691
999 _aVTLSSORT0080*0200*0201*0400*0900*1110*2450*2600*3000*5040*6500*6501*6502*7000*7001*7100*9991