| 000 | 01574ntm a2200253 a 4500 | ||
|---|---|---|---|
| 001 | vtls000083303 | ||
| 003 | KUKTEM | ||
| 005 | 20251117113236.0 | ||
| 008 | 141111t2013 my a f m 000 0 eng d | ||
| 020 | _aTHE0004986(Local) | ||
| 039 | 9 |
_a201905140851 _bSHAHRILJ _y201411111046 _zFida |
|
| 040 | _aUMP | ||
| 090 | _aTS155 .T46 2013 r Bc. | ||
| 100 | 1 | _aTeng, Lik Ching | |
| 245 | 1 | 0 |
_aEvaluating the performance of the operation at the sawmill production company / _cTeng Lik Ching |
| 260 |
_aKuantan, Pahang : _bUMP, _c2013 |
||
| 300 |
_axii, 83 p. : _bill. (some col.) ; _c30 cm. + _e1 CD-ROM |
||
| 502 | _aProject paper (Bachelor of Industrial Technology Management with Honors) -- Universiti Malaysia Pahang - 2013 | ||
| 504 | _aBibliography : p. 64-67 | ||
| 520 | 3 | _aIn this study, it discusses about evaluating the performance of the operation at the sawmill production company. The scope of this study is focusing on the production process in sawmill company. The time frame covered is one year it is in the year of 2013. This study is conducted by using the ARENA simulation software to simulate the modeled process in the simulation software. It is a quantitative study in which the performance is measured by the productivity for the whole system of sawmill. The reducing of the waiting time in the bottleneck station able to provide an improvement in the sawmill production process. | |
| 650 | 0 | _aProduction management | |
| 650 | 0 | _aIndustrial management | |
| 999 |
_aVIRTUA40 _c5300 _d5306 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992 | ||