| 000 | 01616nam a2200253 a 4500 | ||
|---|---|---|---|
| 001 | vtls000044076 | ||
| 003 | KUKTEM | ||
| 005 | 20251117150205.0 | ||
| 008 | 090914t2009 njua f b 001 0 eng d | ||
| 020 | _a9780470391655 | ||
| 020 | _a0470391650 | ||
| 039 | 9 |
_a201107132341 _bVLOAD _c201008051437 _djamie _y200909141131 _znadia |
|
| 040 | _aUMP | ||
| 090 | _aTS157.5 .B35 2009 | ||
| 100 | 1 | _aBaker, Kenneth R. | |
| 245 | 1 | 0 |
_aPrinciples of sequencing and scheduling / _cKenneth R. Baker, Dan Trietsch |
| 260 |
_aHoboken, N.J. : _bJohn Wiley, _cc2009 |
||
| 300 |
_axv, 493 p. : _bill. ; _c25 cm. |
||
| 504 | _aIncludes bibliographical references and indeX | ||
| 505 | 0 | _aIntroduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing | |
| 650 | 0 | _aProduction scheduling | |
| 700 | 1 | _aTrietsch, Dan. | |
| 999 |
_aVIRTUA40 _c53320 _d53326 |
||
| 999 | _aVTLSSORT0080*0200*0201*0400*0900*1000*2450*2600*3000*5040*5050*6500*7000*9991 | ||