000 01616nam a2200253 a 4500
001 vtls000044076
003 KUKTEM
005 20251117150205.0
008 090914t2009 njua f b 001 0 eng d
020 _a9780470391655
020 _a0470391650
039 9 _a201107132341
_bVLOAD
_c201008051437
_djamie
_y200909141131
_znadia
040 _aUMP
090 _aTS157.5 .B35 2009
100 1 _aBaker, Kenneth R.
245 1 0 _aPrinciples of sequencing and scheduling /
_cKenneth R. Baker, Dan Trietsch
260 _aHoboken, N.J. :
_bJohn Wiley,
_cc2009
300 _axv, 493 p. :
_bill. ;
_c25 cm.
504 _aIncludes bibliographical references and indeX
505 0 _aIntroduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing
650 0 _aProduction scheduling
700 1 _aTrietsch, Dan.
999 _aVIRTUA40
_c53320
_d53326
999 _aVTLSSORT0080*0200*0201*0400*0900*1000*2450*2600*3000*5040*5050*6500*7000*9991