000 02551ntm a2200265 a 4500
001 vtls000085135
003 KUKTEM
005 20251117113242.0
008 150130t2013 my a f m 000 0 eng d
020 _aTHE0003487(Local)
039 9 _a201905151204
_birma
_c201501301601
_dfawwaz
_y201501301219
_zfawwaz
040 _aUMP
090 _aTH438.4 .Y37 2013 r Bc.
100 3 _aYap, Qing Fu
245 1 2 _aA study on the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur /
_cYap Qing Fu
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _avii, 61 p. :
_bill. ;
_c30 cm.
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject paper (Bachelor of Engineering (Civil Engineering)) -- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 53-56
520 3 _aConstruction delays are one of the biggest problems construction industries face, it will directly affect the parties involved in the contract, contribute to cost and time overruns, litigation and late in project transfer to owner. Therefore, in order to reduce and prevent delay in construction, it is important to determine the real causes of construction delay. The main objectives of this study are to identify the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur. This study was carried out by conducting literature review and questionnaire survey. There are 29 causes and 15 methods to prevent construction delays have been identified in literature review state and the causes of construction delays have been grouped into eight major groups. The survey questionnaires were distributed to the developer, consultant and contractor in Selangor state and Kuala Lumpur. The main objectives in this research have been achieved. The major group of delays which contributes the most in the construction delays is contractor related delays. The top five causes of delays are unforeseen site condition, finance and payments of completed work, site management, delays caused by subcontractor, improper planning and errors during construction. While the top five methods to prevent construction delays are frequent progress meeting, effective strategic planning, frequent coordination between the parties involved, proper project planning and scheduling and collaborative working in construction
650 0 _aConstruction contracts
650 0 _aProduction scheduling
999 _aVIRTUA40
_c5497
_d5503
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6500*6501*9992