000 02432ntm a2200253 a 4500
001 vtls000083837
003 KUKTEM
005 20251117113244.0
008 141120t2013 my a f m 000 0 eng d
020 _aTHE0007515(Local)
039 9 _a201905161447
_bfawwaz
_c201411261048
_dtraining1
_y201411201223
_zariffin
040 _aUMP
090 _aTS156.6 .F37 2013 r Bc.
100 0 _aFarah Liyana Hassan
245 1 0 _aLead time reduction in SME by using value stream mapping (VSM) technique /
_cFarah Liyana Hassan
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axv, 59 p. :
_bill. (some col.) ;
_c30 cm.
502 _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 58
520 3 _aThis research is related to a study on lead time reduction in SME by using value stream mapping (VSM) technique. VSM was pioneered in the 1980s by Toyota’s chief engineer, Taiichi Ohno and sensei Shigeo Shingo. VSM is the tool or technique to identify the non-value added activities by eliminating it in order to improve the productivity of the company. The objectives of this study are to improve the production lead time, eliminate non- value added at the selected production line or model and lastly to propose a new production system. This study was conducted at Zest Venture (Kadlawo), Kuantan. The systematic approach on methodologies was applied as to ensure the study is successfully carried out. The techniques used were visual observation, survey and time study. The study was taken place for every two weeks. All collected information was illustrated in the VSM chart for further analysis on non-value added activities. The study shows few activities were considered non valued added such as paper stacking at the finishing rack after the printing process and long waiting time after printing and cutting process. Therefore, a few suggestions were proposed to the company’s owner for further action. The implemented improvement had proven the process flow become more efficient and smoothly run without interruption. As a result, the product lead time also reduced from 94.3 minutes to 66 minutes. In term of financial benefits, the company could save about RM1800.60 per month.
650 0 _aQuality assurance
650 0 _aQuality control
999 _aVIRTUA40
_c5550
_d5556
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*6501*9992