000 02491ntm a2200241 a 4500
001 vtls000083037
003 KUKTEM
005 20251117113244.0
008 141104t2013 my da f m 000 0 eng|d
020 _aTHE0007633(Local)
039 9 _a201905171158
_bfawwaz
_c201411051008
_dtraining2
_y201411041729
_ztraining2
040 _aUMP
090 _aTS176 .F35 2013 r Bc.
100 1 _aNur Fakhriah Mohd Noordin
245 1 0 _aLean manufacturing techniques implementation at Zest Venture Sdn Bhd /
_cNur Fakhriah Mohd Noordin
260 _aKuantan, Pahang :
_bUMP,
_c2013
300 _axiii, 44 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
502 _aProject Paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang – 2013
504 _aBibliography : p. 45-46
520 3 _aLean Manufacturing techniques has been widely implemented in industry. Lean manufacturing is a Japanese approach with a model and group of planned methods that is highlight eliminating non-value added activities (waste) while bringing quality products on time at least cost with greater effectiveness This research is about how to implement lean manufacturing techniques in the selected SME company which is Zest Venture Sdn Bhd with three objectives. The first objectives of this study is to propose relevant lean manufacturing techniques which could be applied in Zest Venture as to eliminate and reduce waste that existing in the production. The second objective is to identify and to eliminate non-value added in Zest Venture. Last but not least is to investigate and analyze production lead time and productivity in Zest Venture. The problem statement of this study is the attitude of the workers, lack of knowledge about lean manufacturing and time constraint in implementing lean manufacturing techniques in the company. In this study several methods were used which are trough observation, interview, survey, distribute questionnaire, time study and distance travel study. The techniques that are implemented in the company is 5S, Kaizen and Standard Operation Procedure (SOP). Results obtained from these studies demonstrate that the techniques of lean manufacturing can have a positive impact on the company since being able to reduce the wastage of time and space at the workplace by eliminating the non-value added activity in production line.
650 0 _aManufacturing processes
999 _aVIRTUA40
_c5558
_d5564
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5040*5200*6500*9992