000 00997ntm a2200241 a 4500
001 vtls000084679
003 KUKTEM
005 20251117113253.0
008 141224t2013 my a f m 000 0 eng d
020 _aTHE0003521(Local)
039 9 _a201905132131
_bzulaiha
_y201412241218
_zariffin
040 _aUMP
090 _aTH1491 .F37 2014 r Bc.
100 0 _aNik Farahiyah Nik Mohamed
245 1 0 _aCost comparison between the construction of conventional method and interlocking block system /
_cNik Farahiyah Nik Mohamed
260 _aKuantan, Pahang :
_bUMP,
_c2014
300 _axi, 121 p. :
_bill. (some col.) ;
_c30 cm.
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject paper (Bachelor of Engineering (Civil Engineering)) -- Universiti Malaysia Pahang - 2014
504 _aBibliography : p. 34-36
650 0 _aConcrete blocks
_xCost effectiveness
999 _aVIRTUA40
_c5826
_d5832
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*6500*9992