| 000 | 00977nam a2200265 a 4500 | ||
|---|---|---|---|
| 001 | vtls000062548 | ||
| 003 | KUKTEM | ||
| 005 | 20251125093113.0 | ||
| 008 | 120620t2012 gw a f b 000 0 eng d | ||
| 020 | _a9783642251740 | ||
| 020 | _a3642251749 | ||
| 020 | _a9783642251757 (electronic bk.) | ||
| 020 | _a3642251757 (electronic bk.) | ||
| 039 | 9 |
_a201212261524 _bfauzi _y201206200946 _zfarina |
|
| 040 | _aUMP | ||
| 090 | _aHD69.P75 V36 2012 | ||
| 100 | 1 | _aVanhoucke, Mario | |
| 245 | 1 | 0 |
_aProject management with dynamic scheduling : _bbaseline scheduling, risk analysis and project control / _cMario Vanhoucke |
| 260 |
_aHeidelberg ; _aNew York : _bSpringer, _cc2012 |
||
| 300 |
_axviii, 310 p. : _bill. (some col.) ; _c24 cm. |
||
| 500 | _aIncludes bibliographical references (p. 305-310) | ||
| 650 | 0 | _aProject management | |
| 650 | 0 | _aProduction scheduling | |
| 999 |
_aVIRTUA40 _c61440 _d61446 |
||
| 999 | _aVTLSSORT0080*0200*0201*0202*0203*0400*0900*1000*2450*2600*3000*5000*6500*6501*9992 | ||