245 1 4 _aThe contribution of earned value analysis for cost controlling of construction projects /
_cNg Shi Cia
260 _aKuantan, Pahang :
_bUMP,
_c2014
300 _axii, 89 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Industrial Management
502 _aProject paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014
504 _aBibliography : p. 63-67
520 3 _aEarned Value Analysis (EVA) is a project performance measurement technique. Managers can manage the performance of project by comparing the planned value to actual results. It allows the calculation of cost variance, performance indices and forecast the project cost performance. Therefore, EVA is very important to monitor and control the performance of the construction project. This research is using descriptive study. The purpose of this study is conducted to study the relationship between the EVA and the cost performance of the construction project. Furthermore, the aim of this study also needs to determine the effect of the EVA in the construction project. In this study, survey research will be chosen to collect the data. In order to do the survey research, questionnaire will be chosen as a quantitative method approach. There are 100 companies located in Negeri Sembilan and the sample needed is 80 companies. The results of respondent rates are 38 out of 80 companies. The results have shown that there is a positive correlation between the EVA and the cost performance of the construction project. The result of average mean also indicate that the EVA has successfully to assist the project cost within the budget is the highest mean value among the seven effects of the EVA
650 0 _aCost effectiveness
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/18794
_zAccess in library only
999 _aVIRTUA40
_c6173
_d6179
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6500*8560*9992