000 02044nam a2200229 a 4500
001 vtls000029873
003 KUKTEM
005 20251114204346.0
008 080702t2007 my f m 000 0 eng|d
020 _aTHE0001567(Local)
039 9 _a201905271119
_basmadi
_c201107132026
_dVLOAD
_c200908141454
_dVLOAD
_c200908141425
_dVLOAD
_y200807020907
_zkam
040 _aUMP
090 _aHD9715 .N89 2007 rs Thesis
100 0 _aNuzulhakimi Ayob
245 1 0 _aWeb based progress report for construction /
_cNuzulhakimi Bin Ayob
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _a72 p. :
_bill. (some col.) ;
_c30 cm.
502 _aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3 _aAt the early construction ages, a lot of contractor use the same ways of data management which is by using the manual data management such as using filing system. This conventional method comes out with a lot of problem such as data overlapping, data is not secure, data is not easily accessible (data has been storage in different file) and time consuming for data exchanging. To prevent such problem, web based progress report for construction has been set up in order to smoothing the management of the data in construction. In the system, Microsoft XP is selected as operating system with the Opera and Internet explorer as browser. For the development of user interface, Macromedia dream weaver 2004 has been use by using CFML programming language. To run the system Macromedia Coldfusion Mx has been use with online purpose. Developing the system with user friendly and attractive interface hopefully can facilitate the administrator and user such as site engineer while using the system. The project report has been prepared aiming to help reader to have clear view of the routes and importance ofthe system as well as obtain the advantage from the system. -Author
650 0 _aConstruction industry
_xData processing
999 _aVIRTUA40
_c640
_d646
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*9992