000 03186ntm a2200289 a 4500
001 vtls000094289
003 KUKTEM
005 20251117113317.0
008 160405t2015 my a f 000 0 eng d
020 _aTHE0005355(Local)
039 9 _a201905151123
_bhanafiah
_c201711290933
_dfateeha
_y201604051531
_zhuda
040 _aUMP
090 _aFKP .H39 2015 r Bc.
100 0 _aHazimah Abdul Rahim
245 1 _aModelling and simulation of flexible production line for coil winding assembly /
_cHazimah Abdul Rahim
260 _aKuantan, Pahang :
_bUMP,
_c2015
300 _axxiii, 88 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Manufacturing Engineering
502 _aProject Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2015
504 _aBibliography: p. 84
520 3 _aThis thesis deals with modelling and simulation of flexible production line for coil winding assembly. Flexible production line is a production line capable to change any changes in different product simultaneously and continuously. The reason need of developing flexible production line is to have a high productivity, good quality and low cost and to ensure smoothness of the production line. The main problem at production line is the usage of the conveyer where it can make the space become crowded. The proposed method is by changing to cell manufacturing layout because it is way of lean manufacturing to guide company to implement less waste as possible for product variety to the customers. The objective of this project is to investigate current performance of coil winding assembly and to model and simulate flexible production line using Pro Model simulation software. In this case study, the framework of project will cover on research of cycle time, product mix, flexibility and efficient usage of space. A company has been selected is Vacuumschmelze(M) Sdn Bhd and simulation ProModel 7.0 Software Student Version was used to complete the case. The project is begin by identifying and evaluating the problem occur at the production line. The current condition of production line layout was modelled using simulation ProModel 7.0 Software Student Version. The simulation was run in 8 hours by following the working schedule at company. A total of 10 replication has been set for this project. From the result, the percentage show high utilization from the current performance. The percentage of operation is increase from 9.29% to 63.27%. From the result, it can be concluded that the changing of the new layout by changing the conveyer to the U-shape layout was the most significant factor in productivity enhancement of the production.
610 2 _aFaculty of Manufacturing Engineering
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/25975
_zAccess in library only
999 _aVIRTUA40
_c6528
_d6534
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992